Difference between revisions of "BLTWG Meeting 02/21/2011"

From GlueXWiki
Jump to: navigation, search
 
 
(4 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
  Time: 11:00 EST
 
  Time: 11:00 EST
* Place: ESNET and EVO (with telephone bridge id ??)  
+
* Place: ESNET and EVO (with telephone bridge id 296 3277)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J., Liping G., Franz K., Igor S., Dan S., and Franz K.
  
 
===Agenda===
 
===Agenda===
  
# [[Spring 2011 Hall B beam test: installation and running|Parasitic beam time request items]] -- ''Richard''
+
# [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-2-2011/Beamtest-2-2011.pptx Parasitic beam time request goals] -- ''Richard''
 
# Preparations for beam tests -- ''discussion''
 
# Preparations for beam tests -- ''discussion''
 +
# Work on calculating the field of the PS magnet with a reduced gap -- ''Liping''

Latest revision as of 12:53, 21 February 2011

Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge id 296 3277)
  • Connecting: instructions are here
  • Present: Richard J., Liping G., Franz K., Igor S., Dan S., and Franz K.

Agenda

  1. Parasitic beam time request goals -- Richard
  2. Preparations for beam tests -- discussion
  3. Work on calculating the field of the PS magnet with a reduced gap -- Liping