Difference between revisions of "BLTWG Meeting 02/21/2011"

From GlueXWiki
Jump to: navigation, search
(Agenda)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 296 3277)  
 
* Place: ESNET and EVO (with telephone bridge id 296 3277)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J., Liping G., Franz K., Igor S., Dan S., and Franz K.
  
 
===Agenda===
 
===Agenda===
Line 8: Line 8:
 
# [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-2-2011/Beamtest-2-2011.pptx Parasitic beam time request goals] -- ''Richard''
 
# [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-2-2011/Beamtest-2-2011.pptx Parasitic beam time request goals] -- ''Richard''
 
# Preparations for beam tests -- ''discussion''
 
# Preparations for beam tests -- ''discussion''
 +
# Work on calculating the field of the PS magnet with a reduced gap -- ''Liping''

Latest revision as of 12:53, 21 February 2011

Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge id 296 3277)
  • Connecting: instructions are here
  • Present: Richard J., Liping G., Franz K., Igor S., Dan S., and Franz K.

Agenda

  1. Parasitic beam time request goals -- Richard
  2. Preparations for beam tests -- discussion
  3. Work on calculating the field of the PS magnet with a reduced gap -- Liping