Difference between revisions of "BLTWG Meeting 02/26/2009"

From GlueXWiki
Jump to: navigation, search
 
(Agenda)
Line 8: Line 8:
 
# Report on the Installation Review - ''Jim''
 
# Report on the Installation Review - ''Jim''
 
# Updates on the tagger background simulations - ''Alex''
 
# Updates on the tagger background simulations - ''Alex''
 +
# Tagger dipole field uniformity specification - ''Jim''
 
# Feedback on updated interface drawings - ''Tim''
 
# Feedback on updated interface drawings - ''Tim''
 
# Manpower for the spring 2009 CHESS run - ''Richard''
 
# Manpower for the spring 2009 CHESS run - ''Richard''
 
# Plans for beam tests in 2010 - ''Franz''
 
# Plans for beam tests in 2010 - ''Franz''

Revision as of 15:16, 24 February 2009

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Review of notes from last meeting - Richard
  2. Report on the Installation Review - Jim
  3. Updates on the tagger background simulations - Alex
  4. Tagger dipole field uniformity specification - Jim
  5. Feedback on updated interface drawings - Tim
  6. Manpower for the spring 2009 CHESS run - Richard
  7. Plans for beam tests in 2010 - Franz