Difference between revisions of "BLTWG Meeting 02/26/2009"
From GlueXWiki
(→Agenda) |
|||
Line 8: | Line 8: | ||
# Report on the Installation Review - ''Jim'' | # Report on the Installation Review - ''Jim'' | ||
# Updates on the tagger background simulations - ''Alex'' | # Updates on the tagger background simulations - ''Alex'' | ||
+ | # Tagger dipole field uniformity specification - ''Jim'' | ||
# Feedback on updated interface drawings - ''Tim'' | # Feedback on updated interface drawings - ''Tim'' | ||
# Manpower for the spring 2009 CHESS run - ''Richard'' | # Manpower for the spring 2009 CHESS run - ''Richard'' | ||
# Plans for beam tests in 2010 - ''Franz'' | # Plans for beam tests in 2010 - ''Franz'' |
Revision as of 15:16, 24 February 2009
- Time: 9:30 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present:
Agenda
- Review of notes from last meeting - Richard
- Report on the Installation Review - Jim
- Updates on the tagger background simulations - Alex
- Tagger dipole field uniformity specification - Jim
- Feedback on updated interface drawings - Tim
- Manpower for the spring 2009 CHESS run - Richard
- Plans for beam tests in 2010 - Franz