Difference between revisions of "BLTWG Meeting 02/26/2009"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 2: Line 2:
 
* Place: EVO and ESNET (with telephone bridge)
 
* Place: EVO and ESNET (with telephone bridge)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:
+
* Present: Richard J., Tim W., Alex S., Jim S., Franz K., and Eugene C.
  
 
===Agenda===
 
===Agenda===

Revision as of 10:53, 26 February 2009

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Richard J., Tim W., Alex S., Jim S., Franz K., and Eugene C.

Agenda

  1. Review of notes from last meeting - Richard
  2. Report on the Installation Review - Tim
  3. Version 1 installation schedule - Jim
  4. Update on the tagger background simulations - Alex
  5. Progress at BNL in laser oblution of diamonds - Richard
  6. Tagger dipole field uniformity specification - Jim
  7. Feedback on updated interface drawings - Tim
  8. Manpower for the spring 2009 CHESS run - Richard
  9. Plans for beam tests in 2010 - Franz