BLTWG Meeting 02/26/2009

From GlueXWiki
Revision as of 14:43, 26 February 2009 by Jonesrt (Talk | contribs)

Jump to: navigation, search
  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Richard J., Tim W., Alex S., Jim S., Franz K., and Eugene C.

Agenda

  1. Review of notes from last meeting - Richard
  2. Report on the Installation Review - Tim
  3. Version 1 installation schedule - Jim
  4. Update on the tagger background simulations - Alex
  5. Progress at BNL in laser ablation of diamonds - Richard
  6. Tagger dipole field uniformity specification - Jim
  7. Feedback on updated interface drawings - Tim
  8. Manpower for the spring 2009 CHESS run - Richard
  9. Plans for beam tests in 2010 - Franz

Notes by R. Jones

Report on the Installation Review

Tim

Installation Schedule Version 1

Jim walked us through the construction and installation schedule for the tagger and major photon beamline equipment [1].

Update on the tagger background simulations

Alex walked us through an early draft of his tagger background simulation technical note. [2]

Progress at BNL in laser ablation of diamonds

Richard presented some slides that John Smedley shared with him showing recent progress by the BNL group in thinning diamonds. [3]