Difference between revisions of "BLTWG Meeting 03/02/2015"

From GlueXWiki
Jump to: navigation, search
(Notes)
(Notes)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
 
** phone: 408-740-7256 or 888-240-2560
 
** phone: 408-740-7256 or 888-240-2560
 
* Conference id: 536076821
 
* Conference id: 536076821
* Present: Alex B, Nathan S., Kei M., Tim W., Alexandre D., Eugene C., Curtis M., James M., Brendan P., Franz K.
+
* Present: Alex B, Nathan S., Kei M., Tim W., Alexandre D., Eugene C., Curtis M., James M., Brendan P., Franz K., Richard J., Alex S.
 
+
  
 
=== Agenda ===
 
=== Agenda ===
Line 26: Line 25:
 
Work is continuing with the polarimeter.
 
Work is continuing with the polarimeter.
  
Nathan has found signal cable issues in lowest electron energy counters of TAGH. Looking into it.
+
Nathan has found signal cable issues in highest electron energy counters of TAGH. Looking into it.
  
 
Alex B. turned on TAGM to check power. Some control boards have wrong read back values. Looks like readback resistors not making proper contact.  
 
Alex B. turned on TAGM to check power. Some control boards have wrong read back values. Looks like readback resistors not making proper contact.  

Latest revision as of 13:17, 2 March 2015

Organization

  • Time: 11:30 EST
  • Connecting: detailed instructions are here
  • Conference id: 536076821
  • Present: Alex B, Nathan S., Kei M., Tim W., Alexandre D., Eugene C., Curtis M., James M., Brendan P., Franz K., Richard J., Alex S.

Agenda

  1. Announcements
  2. Update on polarimetry - Kei M.
  3. Update on the fixed tagger hodoscope - Nathan S.
  4. Update on the pair spectrometer - Alex S.
  5. Update on the tagger microscope - Alex B.
  6. Update on diamond radiators - Brendan P.
  7. any other business

Notes

Fast feedback will not be ready for the run. No expected completion date. Magnet response hasn't been checked.

Work is continuing with the polarimeter.

Nathan has found signal cable issues in highest electron energy counters of TAGH. Looking into it.

Alex B. turned on TAGM to check power. Some control boards have wrong read back values. Looks like readback resistors not making proper contact.

Brendan is looking into epoxies for mounting diamonds and is continuing the analysis of CHESS data. Alex B. and Nathan S. gave Tim the diamond mount with 3 diamonds. Hoop will be mounted and surveyed tomorrow (Tuesday). Sinmat is unable to thin diamonds as originally proposed. One possibility is to use a laser to cleave a diamond into 2 with help from Applied Diamond, or to purchase diamonds from a company in Singapore.

Alex S. is busy with alignment of coarse counters.

Alex B. will rearrange the preamps to put noisy ones on the outer wedges.