Difference between revisions of "BLTWG Meeting 03/04/2013"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Organization)
Line 3: Line 3:
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:
+
* Present: Richard J., Alex B., Brendan P., Curtis M., Barry R., Igor S., Franz K., Mike D.,
 
----
 
----
  

Revision as of 13:11, 4 March 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., Alex B., Brendan P., Curtis M., Barry R., Igor S., Franz K., Mike D.,

Agenda

  1. Announcements
  2. Status of the CUA construction contract - Franz
  3. Status of the UConn construction contract - James, Alex
  4. Microscope alignment and control system - Richard
  5. Progress with pair spectrometer hodoscope - Alex
  6. Progress with the active collimator interface - Richard
  7. Need for better documentation for interfaces - discussion
  • Active collimator electronics (power, shielding, cabling)
  • Microscope electronics (power, cooling, shielding, cabling)
  • Microscope relocation plan (mechanisms, cable routing, clearances)
  1. Documenting our tagger magnet mapping plan - Tim
  2. Progress with tagger installation schedule - Tim
  3. Brief update on Mainz polarimeter - Mike
  4. any other business