Difference between revisions of "BLTWG Meeting 03/04/2013"

From GlueXWiki
Jump to: navigation, search
(Organization)
(Organization)
Line 3: Line 3:
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Richard J., Alex B., Brendan P., Curtis M., Barry R., Igor S., Franz K., Mike D.,  
+
* Present: Richard J., Alex B., Brendan P., James M., Curtis M., Barry R., Igor S., Franz K., Mike D., Todd S., and Alex S.
 
----
 
----
  

Revision as of 13:21, 4 March 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., Alex B., Brendan P., James M., Curtis M., Barry R., Igor S., Franz K., Mike D., Todd S., and Alex S.

Agenda

  1. Announcements
  2. Status of the CUA construction contract - Franz
  3. Status of the UConn construction contract - James, Alex
  4. Microscope alignment and control system - Richard
  5. Progress with pair spectrometer hodoscope - Alex
  6. Progress with the active collimator interface - Richard
  7. Need for better documentation for interfaces - discussion
  • Active collimator electronics (power, shielding, cabling)
  • Microscope electronics (power, cooling, shielding, cabling)
  • Microscope relocation plan (mechanisms, cable routing, clearances)
  1. Documenting our tagger magnet mapping plan - Tim
  2. Progress with tagger installation schedule - Tim
  3. Brief update on Mainz polarimeter - Mike
  4. any other business