Difference between revisions of "BLTWG Meeting 03/04/2013"

From GlueXWiki
Jump to: navigation, search
(Created page with "===Organization=== * Time: 11:30 EST * Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community) * Connecting: instructions are [[Tagged Beam Group Biweekly Meeting...")
 
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(8 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:
+
* Present: Richard J., Alex B., Brendan P., James M., Curtis M., Barry R., Igor S., Franz K., Mike D., Todd S., and Alex S.
 
----
 
----
  
Line 9: Line 9:
 
# Announcements
 
# Announcements
 
# Status of the CUA construction contract - ''Franz''
 
# Status of the CUA construction contract - ''Franz''
# Status of the UConn construction contract - ''James''
+
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2181 Status of the UConn construction contract] - ''James'', ''Alex''
 
# Microscope alignment and control system - ''Richard''
 
# Microscope alignment and control system - ''Richard''
 
# Progress with pair spectrometer hodoscope - ''Alex''
 
# Progress with pair spectrometer hodoscope - ''Alex''
 
# Progress with the active collimator interface - ''Richard''
 
# Progress with the active collimator interface - ''Richard''
 
# Need for better documentation for interfaces - ''discussion''
 
# Need for better documentation for interfaces - ''discussion''
:* Active collimator electronics (power, shielding, cabling)
+
#* Active collimator electronics (power, shielding, cabling)
:* Microscope electronics (power, cooling, shielding, cabling)
+
#* Microscope electronics (power, cooling, shielding, cabling)
:* Microscope relocation plan (mechanisms, cable routing, clearances)
+
#* Microscope relocation plan (mechanisms, cable routing, clearances)
 
# Documenting our tagger magnet mapping plan - ''Tim''
 
# Documenting our tagger magnet mapping plan - ''Tim''
 
# Progress with tagger installation schedule - ''Tim''
 
# Progress with tagger installation schedule - ''Tim''
 +
# [https://userweb.jlab.org/~dugger/triPol/mainz/MainzUpdate1.pdf Brief update on Mainz polarimeter] - ''Mike''
 
# ''any other business''
 
# ''any other business''

Latest revision as of 16:58, 24 February 2017

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., Alex B., Brendan P., James M., Curtis M., Barry R., Igor S., Franz K., Mike D., Todd S., and Alex S.

Agenda

  1. Announcements
  2. Status of the CUA construction contract - Franz
  3. Status of the UConn construction contract - James, Alex
  4. Microscope alignment and control system - Richard
  5. Progress with pair spectrometer hodoscope - Alex
  6. Progress with the active collimator interface - Richard
  7. Need for better documentation for interfaces - discussion
    • Active collimator electronics (power, shielding, cabling)
    • Microscope electronics (power, cooling, shielding, cabling)
    • Microscope relocation plan (mechanisms, cable routing, clearances)
  8. Documenting our tagger magnet mapping plan - Tim
  9. Progress with tagger installation schedule - Tim
  10. Brief update on Mainz polarimeter - Mike
  11. any other business