Difference between revisions of "BLTWG Meeting 03/05/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 16: Line 16:
 
#* CUA hodoscope
 
#* CUA hodoscope
 
#* ASU polarimeter
 
#* ASU polarimeter
 +
#** [http://nuclear.gla.ac.uk/~kl/triplet/ring_a1.jpg] Strip detector from Mainz, MIDAS detector]
 +
#** [http://nuclear.gla.ac.uk/~kl/triplet/triplet4.gif Possible setup for Mainz polarimiter test]
 
#* UNCW/JLab pair counters
 
#* UNCW/JLab pair counters
 
#* JLab pair spectrometer, target
 
#* JLab pair spectrometer, target

Revision as of 10:44, 5 March 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 472 2913)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. UConn construction SOW, draft budget - Richard
  3. Reports from working groups
  4. Initial Calibration and Alignment Discussions
    • Alignment issues with the tagger system?
    • Energy calibration for the tagging system?
    • End point energy?

Notes