Difference between revisions of "BLTWG Meeting 03/05/2012"
From GlueXWiki
(One intermediate revision by one other user not shown) | |||
Line 2: | Line 2: | ||
* Place: ESNET and EVO (with telephone bridge id 487 3954) | * Place: ESNET and EVO (with telephone bridge id 487 3954) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Yi Q., Curtis M., Ken L., Alex S., Mike D., Igor S., Richard J., Fridah M. |
---- | ---- |
Latest revision as of 12:37, 5 March 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 487 3954)
- Connecting: instructions are here
- Present: Yi Q., Curtis M., Ken L., Alex S., Mike D., Igor S., Richard J., Fridah M.
Agenda
- Announcements
- UConn construction SOW, draft budget - Richard
- Reports from working groups
- Glasgow goniometer + ladder
- UConn diamonds
- UConn electronics
- UConn microscope
- CUA hodoscope
- ASU polarimeter
- UNCW/JLab pair counters
- JLab pair spectrometer, target
- Initial Calibration and Alignment Discussions
- Alignment issues with the tagger system?
- Energy calibration for the tagging system?
- End point energy?