Difference between revisions of "BLTWG Meeting 03/05/2012"
From GlueXWiki
(Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id 472 2913) * Connecting: instructions are here * Present: ---- ===Age...") |
(→Agenda) |
||
Line 14: | Line 14: | ||
#* UConn microscope | #* UConn microscope | ||
#* CUA hodoscope | #* CUA hodoscope | ||
− | #* ASU polarimeter | + | #* ASU polarimeter |
#* UNCW/JLab pair counters | #* UNCW/JLab pair counters | ||
#* JLab pair spectrometer, target | #* JLab pair spectrometer, target |
Revision as of 16:59, 2 March 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 472 2913)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- UConn construction SOW, draft budget - Richard
- Reports from working groups
- Glasgow goniometer + ladder
- UConn diamonds
- UConn electronics
- UConn microscope
- CUA hodoscope
- ASU polarimeter
- UNCW/JLab pair counters
- JLab pair spectrometer, target
- Initial Calibration and Alignment Discussions
- Alignment issues with the tagger system?
- Energy calibration for the tagging system?
- End point energy?