Difference between revisions of "BLTWG Meeting 03/05/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 10: Line 10:
 
# Reports from working groups
 
# Reports from working groups
 
#* Glasgow goniometer + ladder
 
#* Glasgow goniometer + ladder
[http://nuclear.gla.ac.uk/~kl/GlueX/goni_newport_comments.gif 1st iteration of Newport design]
+
#*  [http://nuclear.gla.ac.uk/~kl/GlueX/goni_newport_comments.gif 1st iteration of Newport design]
 
#* UConn diamonds
 
#* UConn diamonds
 
#* UConn electronics
 
#* UConn electronics

Revision as of 10:19, 5 March 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 472 2913)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. UConn construction SOW, draft budget - Richard
  3. Reports from working groups
    • Glasgow goniometer + ladder
    • 1st iteration of Newport design
    • UConn diamonds
    • UConn electronics
    • UConn microscope
    • CUA hodoscope
    • ASU polarimeter
    • UNCW/JLab pair counters
    • JLab pair spectrometer, target
  4. Initial Calibration and Alignment Discussions
    • Alignment issues with the tagger system?
    • Energy calibration for the tagging system?
    • End point energy?

Notes