BLTWG Meeting 03/05/2012
From GlueXWiki
Revision as of 16:58, 2 March 2012 by Cmeyer (Talk | contribs) (Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id 472 2913) * Connecting: instructions are here * Present: ---- ===Age...")
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 472 2913)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- UConn construction SOW, draft budget - Richard
- Reports from working groups
- Glasgow goniometer + ladder
- UConn diamonds
- UConn electronics
- UConn microscope
- CUA hodoscope
- ASU polarimeter Study of accidentals
- UNCW/JLab pair counters
- JLab pair spectrometer, target
- Initial Calibration and Alignment Discussions
- Alignment issues with the tagger system?
- Energy calibration for the tagging system?
- End point energy?