BLTWG Meeting 03/05/2012

From GlueXWiki
Revision as of 16:58, 2 March 2012 by Cmeyer (Talk | contribs) (Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id 472 2913) * Connecting: instructions are here * Present: ---- ===Age...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 472 2913)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. UConn construction SOW, draft budget - Richard
  3. Reports from working groups
    • Glasgow goniometer + ladder
    • UConn diamonds
    • UConn electronics
    • UConn microscope
    • CUA hodoscope
    • ASU polarimeter Study of accidentals
    • UNCW/JLab pair counters
    • JLab pair spectrometer, target
  4. Initial Calibration and Alignment Discussions
    • Alignment issues with the tagger system?
    • Energy calibration for the tagging system?
    • End point energy?

Notes