Difference between revisions of "BLTWG Meeting 03/08/2010"

From GlueXWiki
Jump to: navigation, search
m
m
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge)  
 
* Place: ESNET and EVO (with telephone bridge)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Alex S., Tim W., David L, Bill C., Yi Q., Ashot G., Liping G.,  Richard J., and Igor S.
+
* Present: Alex S., Tim W., David L, Bill C., Yi Q., Ashot G., Liping G.,  Richard J., Brendan P., and Igor S.
  
 
===Agenda===
 
===Agenda===

Revision as of 13:16, 8 March 2010

  • Time: 11:00 EST
  • Place: ESNET and EVO (with telephone bridge)
  • Connecting: instructions are here
  • Present: Alex S., Tim W., David L, Bill C., Yi Q., Ashot G., Liping G., Richard J., Brendan P., and Igor S.

Agenda

  1. Progress on diamond procurement, laser ablation -- Richard
  2. Paper on tagger and photon beam design -- Richard
  3. Creating magnetic field tables from ANSYS -- Alex
  4. Beam test planning -- Igor

Notes