Difference between revisions of "BLTWG Meeting 03/18/2013"

From GlueXWiki
Jump to: navigation, search
(Created page with "===Organization=== * Time: 11:30 EST * Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community) * Connecting: instructions are [[Tagged Beam Group Biweekly Meeting...")
 
(Organization)
Line 3: Line 3:
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:
+
* Present: Richard J., Alex B., James M, Brendan P, Curtis M., Mike M, Yi Q., and Sascha S.
 
----
 
----
  

Revision as of 11:33, 18 March 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., Alex B., James M, Brendan P, Curtis M., Mike M, Yi Q., and Sascha S.

Agenda

  1. Announcements
  2. Status of the CUA construction contract - Franz
  3. Status of the microscope construction contract - James
  4. Status of the microscope electronics construction - Alex
  5. Progress with pair spectrometer hodoscope - Sascha
  6. Discussion of installation issues - Richard
    • pair converter target design
    • diamond radiator target holder
    • active collimator software interface
    • microscope readout radiation shielding
    • low-voltage power supplies and interfaces
  7. Tagger magnet mapping plan - Tim
  8. Update on polarimetry - Mike
  9. State of the beamline simulation - Sascha
  10. any other business