BLTWG Meeting 03/18/2013

From GlueXWiki
Revision as of 10:22, 18 March 2013 by Jonesrt (Talk | contribs) (Created page with "===Organization=== * Time: 11:30 EST * Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community) * Connecting: instructions are [[Tagged Beam Group Biweekly Meeting...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Status of the CUA construction contract - Franz
  3. Status of the microscope construction contract - James
  4. Status of the microscope electronics construction - Alex
  5. Progress with pair spectrometer hodoscope - Sascha
  6. Discussion of installation issues - Richard
    • pair converter target design
    • diamond radiator target holder
    • active collimator software interface
    • microscope readout radiation shielding
    • low-voltage power supplies and interfaces
  7. Tagger magnet mapping plan - Tim
  8. Update on polarimetry - Mike
  9. State of the beamline simulation - Sascha
  10. any other business