Difference between revisions of "BLTWG Meeting 04/01/2013"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 8: Line 8:
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
 +
# Report from accelerator liaison - ''Todd''
 
# Status of the CUA construction contract
 
# Status of the CUA construction contract
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-fixed/sober-3-23-2013.pdf revised fixed array layout]
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-fixed/sober-3-23-2013.pdf revised fixed array layout]

Revision as of 11:28, 1 April 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Report from accelerator liaison - Todd
  3. Status of the CUA construction contract
  4. Status of the microscope construction contract - James
  5. Status of the microscope electronics construction - Alex
  6. Progress with pair spectrometer hodoscope - Sascha
  7. Update on polarimetry - Mike
  8. Discussion of installation issues - James
  9. Draft of tagger magnet mapping plan - Dan
  10. any other business