Difference between revisions of "BLTWG Meeting 04/01/2013"
From GlueXWiki
(Created page with "===Organization=== * Time: 11:30 EST * Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community) * Connecting: instructions are [[Tagged Beam Group Biweekly Meeting...") |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
(3 intermediate revisions by one other user not shown) | |||
Line 3: | Line 3: | ||
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community) | * Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Richard J., Alex B., James M., Brendan P. connecting from UConn, Alex S., Todd S., Tim W. at Jlab, Curtis M. at CMU; Barry R., Mike D. at ASU, and Franz K. at CUA. |
---- | ---- | ||
===Agenda=== | ===Agenda=== | ||
# Announcements | # Announcements | ||
− | # Status of the CUA construction contract | + | # Report from accelerator liaison - ''Todd'' |
− | # [http:// | + | # Status of the CUA construction contract |
+ | #* [http://zeus.phys.uconn.edu/halld/tagger/fp-fixed/sober-3-23-2013.pdf revised fixed array layout] | ||
+ | # [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2181 Status of the microscope construction contract] - ''James'' | ||
# Status of the microscope electronics construction - ''Alex'' | # Status of the microscope electronics construction - ''Alex'' | ||
# Progress with pair spectrometer hodoscope - ''Sascha'' | # Progress with pair spectrometer hodoscope - ''Sascha'' |
Latest revision as of 16:53, 24 February 2017
Organization
- Time: 11:30 EST
- Place: ESNET and Seevogh (Jlab community)
- Connecting: instructions are here
- Present: Richard J., Alex B., James M., Brendan P. connecting from UConn, Alex S., Todd S., Tim W. at Jlab, Curtis M. at CMU; Barry R., Mike D. at ASU, and Franz K. at CUA.
Agenda
- Announcements
- Report from accelerator liaison - Todd
- Status of the CUA construction contract
- Status of the microscope construction contract - James
- Status of the microscope electronics construction - Alex
- Progress with pair spectrometer hodoscope - Sascha
- Update on polarimetry - Mike
- Discussion of installation issues - James
- Draft of tagger magnet mapping plan - Dan
- any other business