Difference between revisions of "BLTWG Meeting 04/01/2013"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(2 intermediate revisions by one other user not shown)
Line 3: Line 3:
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J., Alex B., James M., Brendan P. connecting from UConn, Alex S., Todd S., Tim W. at Jlab, Curtis M. at CMU; Barry R., Mike D. at ASU, and Franz K. at CUA.
 
----
 
----
  
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
 +
# Report from accelerator liaison - ''Todd''
 
# Status of the CUA construction contract
 
# Status of the CUA construction contract
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-fixed/sober-3-23-2013.pdf revised fixed array layout]
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-fixed/sober-3-23-2013.pdf revised fixed array layout]
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2181 Status of the microscope construction contract] - ''James''
+
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2181 Status of the microscope construction contract] - ''James''
 
# Status of the microscope electronics construction - ''Alex''
 
# Status of the microscope electronics construction - ''Alex''
 
# Progress with pair spectrometer hodoscope - ''Sascha''
 
# Progress with pair spectrometer hodoscope - ''Sascha''

Latest revision as of 16:53, 24 February 2017

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., Alex B., James M., Brendan P. connecting from UConn, Alex S., Todd S., Tim W. at Jlab, Curtis M. at CMU; Barry R., Mike D. at ASU, and Franz K. at CUA.

Agenda

  1. Announcements
  2. Report from accelerator liaison - Todd
  3. Status of the CUA construction contract
  4. Status of the microscope construction contract - James
  5. Status of the microscope electronics construction - Alex
  6. Progress with pair spectrometer hodoscope - Sascha
  7. Update on polarimetry - Mike
  8. Discussion of installation issues - James
  9. Draft of tagger magnet mapping plan - Dan
  10. any other business