Difference between revisions of "BLTWG Meeting 04/01/2013"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 8: | Line 8: | ||
===Agenda=== | ===Agenda=== | ||
# Announcements | # Announcements | ||
+ | # Report from accelerator liaison - ''Todd'' | ||
# Status of the CUA construction contract | # Status of the CUA construction contract | ||
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-fixed/sober-3-23-2013.pdf revised fixed array layout] | #* [http://zeus.phys.uconn.edu/halld/tagger/fp-fixed/sober-3-23-2013.pdf revised fixed array layout] |
Revision as of 11:28, 1 April 2013
Organization
- Time: 11:30 EST
- Place: ESNET and Seevogh (Jlab community)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- Report from accelerator liaison - Todd
- Status of the CUA construction contract
- Status of the microscope construction contract - James
- Status of the microscope electronics construction - Alex
- Progress with pair spectrometer hodoscope - Sascha
- Update on polarimetry - Mike
- Discussion of installation issues - James
- Draft of tagger magnet mapping plan - Dan
- any other business