Difference between revisions of "BLTWG Meeting 04/02/2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id 495 6787) * Connecting: instructions are here * Present: ---- ===Agend...")
 
Line 13: Line 13:
 
#* UConn electronics
 
#* UConn electronics
 
#* UConn microscope
 
#* UConn microscope
#* ASU polarimeter
+
#* ASU polarimeter [http://www.public.asu.edu/~dugger/bFieldStudy.pdf Magnetic field study]
 
#* UNCW/JLab pair counters
 
#* UNCW/JLab pair counters
 
#* JLab pair spectrometer, converter
 
#* JLab pair spectrometer, converter

Revision as of 11:13, 2 April 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 495 6787)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Construction contracts - Alex
  3. Reports from working groups
    • CUA hodoscope
    • Glasgow goniometer + ladder
    • UConn diamonds
    • UConn electronics
    • UConn microscope
    • ASU polarimeter Magnetic field study
    • UNCW/JLab pair counters
    • JLab pair spectrometer, converter
  4. Calibration and alignment wiki page

Notes