(Prep for tagger design internal review at JLab)
(Prep for tagger design internal review at JLab)
Line 23: Line 23:
 
# Schedule - Jim
 
# Schedule - Jim
 
# Installation - Jim
 
# Installation - Jim
 +
 +
There are still some drawings to be completed and some simulations that still have to be finished in preparation for the review.  Other members of the working group are asked to review the updated specifications document.
  
 
====Review of the machine interface document====
 
====Review of the machine interface document====

Revision as of 11:32, 10 April 2009

  • Time: 9:30 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Richard J., Igor S., Jim S., Tim W.,

Agenda

  1. Prep for tagger design internal review at JLab - Jim
  2. Review of the machine interface document - Jim
  3. Review of the tagger magnet spec - Jim
  4. Agenda for beamline section of collaboration meeting - Richard
  5. Update on the spring 2009 CHESS run - Richard
  6. Possible projects for new collaborators - Richard
  7. New meeting time for rest of semester - Richard

Notes by R. Jones

Prep for tagger design internal review at JLab

The date for the internal tagger magnet review is set for May 19 at Jefferson Lab.

  1. Overview - Eugene
  2. Requirements and specifications - Jim
  3. Design - Tim
  4. ME simulations - Bill
  5. Schedule - Jim
  6. Installation - Jim

There are still some drawings to be completed and some simulations that still have to be finished in preparation for the review. Other members of the working group are asked to review the updated specifications document.

Review of the machine interface document

Review of the tagger magnet spec

Agenda for beamline section of collaboration meeting

Update on the spring 2009 CHESS run

Possible projects for new collaborators

New meeting time for rest of semester