Line 18: | Line 18: | ||
The date for the review is set for May 19. | The date for the review is set for May 19. | ||
# Overview - Eugene | # Overview - Eugene | ||
− | # Requirements and | + | # Requirements and specifications - Jim |
# Design - Tim | # Design - Tim | ||
# ME simulations - Bill | # ME simulations - Bill |
Revision as of 11:19, 10 April 2009
- Time: 9:30 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: Richard J., Igor S., Jim S., Tim W.,
Contents
- 1 Agenda
- 2 Notes by R. Jones
- 2.1 Prep for tagger design internal review at JLab
- 2.2 Review of the machine interface document
- 2.3 Review of the tagger magnet spec
- 2.4 Agenda for beamline section of collaboration meeting
- 2.5 Update on the spring 2009 CHESS run
- 2.6 Possible projects for new collaborators
- 2.7 New meeting time for rest of semester
Agenda
- Prep for tagger design internal review at JLab - Jim
- Review of the machine interface document - Jim
- Review of the tagger magnet spec - Jim
- Agenda for beamline section of collaboration meeting - Richard
- Update on the spring 2009 CHESS run - Richard
- Possible projects for new collaborators - Richard
- New meeting time for rest of semester - Richard
Notes by R. Jones
Prep for tagger design internal review at JLab
The date for the review is set for May 19.
- Overview - Eugene
- Requirements and specifications - Jim
- Design - Tim
- ME simulations - Bill
- Schedule - Jim
- Installation - Jim