Difference between revisions of "BLTWG Meeting 04/15/2013"

From GlueXWiki
Jump to: navigation, search
(Created page with "===Organization=== * Time: 11:30 EST * Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community) * Connecting: instructions are [[Tagged Beam Group Biweekly Meeting...")
 
(Agenda)
Line 11: Line 11:
 
# Report from accelerator liaison - ''Todd''
 
# Report from accelerator liaison - ''Todd''
 
# Report on the fixed array construction - ''Franz''
 
# Report on the fixed array construction - ''Franz''
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-fixed/sober-3-23-2013.pdf revised fixed array layout]
+
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout]
 
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2181 Report on the microscope construction] - ''James''
 
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2181 Report on the microscope construction] - ''James''
 
# Status of the microscope electronics construction - ''Alex''
 
# Status of the microscope electronics construction - ''Alex''

Revision as of 09:12, 15 April 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Report on construction of the PS detectors - Sascha
  3. Report from accelerator liaison - Todd
  4. Report on the fixed array construction - Franz
  5. Report on the microscope construction - James
  6. Status of the microscope electronics construction - Alex
  7. Update on polarimetry - Mike
  8. Discussion of installation issues - James
  9. Draft of tagger magnet mapping plan - Dan
  10. any other business