Difference between revisions of "BLTWG Meeting 04/15/2013"

From GlueXWiki
Jump to: navigation, search
Line 13: Line 13:
 
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout]
 
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout]
 
#* [[fixed array: design]]
 
#* [[fixed array: design]]
# [https://halldweb1.jlab.org/manuals/HallD_Hodoscope.pttx Base/Amplifier for fixed-array PMT] - ''Vladimir''
+
# [https://halldweb1.jlab.org/manuals/HallD_Hodoscope.pdf Base/Amplifier for fixed-array PMT] - ''Vladimir''
 
# Report on the microscope construction - ''James''
 
# Report on the microscope construction - ''James''
 
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule]
 
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule]

Revision as of 11:34, 15 April 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Report on construction of the PS detectors - Sascha
  3. Report from accelerator liaison - Todd
  4. Report on the fixed array construction - Franz
  5. Base/Amplifier for fixed-array PMT - Vladimir
  6. Report on the microscope construction - James
  7. Status of the microscope electronics construction - Alex
  8. Update on polarimetry - Mike
  9. Discussion of installation issues - James
  10. Draft of tagger magnet mapping plan - Dan
  11. any other business