Difference between revisions of "BLTWG Meeting 04/15/2013"

From GlueXWiki
Jump to: navigation, search
(Organization)
(Agenda)
Line 13: Line 13:
 
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout]
 
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout]
 
#* [[fixed array: design]]
 
#* [[fixed array: design]]
 +
#* [[Link title]]
 
# Report on the microscope construction - ''James''
 
# Report on the microscope construction - ''James''
 
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule]
 
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule]

Revision as of 14:28, 15 April 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., James M., Alex B., Brendan P, Alex S., Yi Q., Igor S., Bill C., Tim W., Vladimir T., Curtis M., Dan S., and Franz K.

Agenda

  1. Announcements
  2. Base/Amplifier for fixed-array PMT - Vladimir
  3. Report from accelerator liaison - Todd
  4. Report on the fixed array construction - Franz
  5. Report on the microscope construction - James
  6. Status of the microscope electronics construction - Alex
  7. Update on polarimetry - Mike
  8. Discussion of installation issues - James
  9. Draft of tagger magnet mapping plan - Dan
  10. any other business