Difference between revisions of "BLTWG Meeting 04/15/2013"

From GlueXWiki
Jump to: navigation, search
(Organization)
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(2 intermediate revisions by one other user not shown)
Line 8: Line 8:
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
# [https://halldweb1.jlab.org/manuals/HallD_Hodoscope.pdf Base/Amplifier for fixed-array PMT] - ''Vladimir''
+
# [https://halldweb.jlab.org/manuals/HallD_Hodoscope.pdf Base/Amplifier for fixed-array PMT] - ''Vladimir''
 
# Report from accelerator liaison - ''Todd''
 
# Report from accelerator liaison - ''Todd''
 
# Report on the fixed array construction - ''Franz''
 
# Report on the fixed array construction - ''Franz''
 
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout]
 
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout]
 
#* [[fixed array: design]]
 
#* [[fixed array: design]]
 +
#* [[Bill's design]]
 
# Report on the microscope construction - ''James''
 
# Report on the microscope construction - ''James''
 
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule]
 
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule]

Latest revision as of 11:07, 31 March 2015

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., James M., Alex B., Brendan P, Alex S., Yi Q., Igor S., Bill C., Tim W., Vladimir T., Curtis M., Dan S., and Franz K.

Agenda

  1. Announcements
  2. Base/Amplifier for fixed-array PMT - Vladimir
  3. Report from accelerator liaison - Todd
  4. Report on the fixed array construction - Franz
  5. Report on the microscope construction - James
  6. Status of the microscope electronics construction - Alex
  7. Update on polarimetry - Mike
  8. Discussion of installation issues - James
  9. Draft of tagger magnet mapping plan - Dan
  10. any other business