Difference between revisions of "BLTWG Meeting 04/16/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 16: Line 16:
 
#* UNCW/JLab pair counters
 
#* UNCW/JLab pair counters
 
#* JLab pair spectrometer, converter
 
#* JLab pair spectrometer, converter
 +
# Beam conditions for rare eta physics vs spectroscopy - ''discussion''
 
# [https://halldweb1.jlab.org/wiki/index.php/Alignment_and_Calibration  Calibration and alignment wiki page]
 
# [https://halldweb1.jlab.org/wiki/index.php/Alignment_and_Calibration  Calibration and alignment wiki page]
 
----
 
----
  
 
===Notes===
 
===Notes===

Revision as of 11:31, 16 April 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 510 8327)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Construction contracts - Alex
  3. Reports from working groups
    • CUA hodoscope
    • Glasgow goniometer + ladder
    • UConn diamonds
    • UConn electronics
    • UConn microscope
    • ASU polarimeter
    • UNCW/JLab pair counters
    • JLab pair spectrometer, converter
  4. Beam conditions for rare eta physics vs spectroscopy - discussion
  5. Calibration and alignment wiki page

Notes