Difference between revisions of "BLTWG Meeting 04/16/2012"

From GlueXWiki
Jump to: navigation, search
(Notes)
(Agenda)
Line 16: Line 16:
 
#* UNCW/JLab pair counters
 
#* UNCW/JLab pair counters
 
#* JLab pair spectrometer, converter
 
#* JLab pair spectrometer, converter
 +
#* [[ Private: Pair Spectrometer beam test |  Pair Spectrometer Hall-B beam test, 2012 ]]
 +
 
# Beam conditions for rare eta physics vs spectroscopy - ''discussion''
 
# Beam conditions for rare eta physics vs spectroscopy - ''discussion''
 
# [https://halldweb1.jlab.org/wiki/index.php/Alignment_and_Calibration  Calibration and alignment wiki page]
 
# [https://halldweb1.jlab.org/wiki/index.php/Alignment_and_Calibration  Calibration and alignment wiki page]

Revision as of 12:02, 16 April 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 510 8327)
  • Connecting: instructions are here
  • Present: Richard J., Alex S., Tim W., and Yi Q.

Agenda

  1. Announcements
  2. Construction contracts - Alex
  3. Reports from working groups
  1. Beam conditions for rare eta physics vs spectroscopy - discussion
  2. Calibration and alignment wiki page

Notes

quoted from Curtis M. email message of 4/16/2012

GlueX running conditions. I see three comparison points:

  1. 1*10^7 photons/second initial GlueX running
  2. 3*10^7 photons/second minimum intensity in 2nd part of GlueX
  3. 1*10^8 photons/second maximum ``possible" rate in GlueX