Difference between revisions of "BLTWG Meeting 04/23/2009"

From GlueXWiki
Jump to: navigation, search
Line 2: Line 2:
 
* Place: EVO and ESNET (with telephone bridge)
 
* Place: EVO and ESNET (with telephone bridge)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Richard J., Jim S., Alex S., Igor S.,Lipeng G., and Ashot G.
+
* Present: Richard J., Jim S., Alex S., Igor S.,Lipeng G., Ashot G, and Tim W.
  
  

Revision as of 11:17, 20 April 2009

  • Time: 11:00 EST
  • Place: EVO and ESNET (with telephone bridge)
  • Connecting: instructions are here
  • Present: Richard J., Jim S., Alex S., Igor S.,Lipeng G., Ashot G, and Tim W.


Agenda

  1. Preparation for the CHESS run in two weeks - Richard
  2. Preparation for tagger design internal review at JLab - Tim
  3. Meeting on photon beam stabilization scheme - Jim
  4. Review of the machine interface document - Jim
  5. Review of the tagger magnet spec - Jim
  6. Two page beam line summary document - Jim
  7. Agenda for beamline section of collaboration meeting - Richard
  8. Possible projects for new collaborators - Richard

Notes by R. Jones

Preparation for the CHESS run in two weeks

Note from Franz Klein:

I have the goniometer target ladder at home: the 'good 50' looks more darkened than 2 1/2 years ago - for sure an interesting comparison to do! I copied the goniometer and beam info from g13 (and parts of g9). I probably cannot give you a pixel-to-pixel variation of the charge but for a position information of ~100-150 microns.
It would be good to find out when Ken wants us to be at CHESS; the last times he spent a day or so to set up the beamline - it would be good to know whether he is doing that on Friday or the weekend? Talk to you later this week.

Prep for tagger design internal review at JLab