Difference between revisions of "BLTWG Meeting 04/23/2009"
From GlueXWiki
Line 2: | Line 2: | ||
* Place: EVO and ESNET (with telephone bridge) | * Place: EVO and ESNET (with telephone bridge) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: Richard J., Jim S., Alex S., Igor S.,Lipeng G., | + | * Present: Richard J., Jim S., Alex S., Igor S.,Lipeng G., Ashot G, and Tim W. |
Revision as of 11:17, 20 April 2009
- Time: 11:00 EST
- Place: EVO and ESNET (with telephone bridge)
- Connecting: instructions are here
- Present: Richard J., Jim S., Alex S., Igor S.,Lipeng G., Ashot G, and Tim W.
Contents
Agenda
- Preparation for the CHESS run in two weeks - Richard
- Preparation for tagger design internal review at JLab - Tim
- Meeting on photon beam stabilization scheme - Jim
- Review of the machine interface document - Jim
- Review of the tagger magnet spec - Jim
- Two page beam line summary document - Jim
- Agenda for beamline section of collaboration meeting - Richard
- Possible projects for new collaborators - Richard
Notes by R. Jones
Preparation for the CHESS run in two weeks
Note from Franz Klein:
- I have the goniometer target ladder at home: the 'good 50' looks more darkened than 2 1/2 years ago - for sure an interesting comparison to do! I copied the goniometer and beam info from g13 (and parts of g9). I probably cannot give you a pixel-to-pixel variation of the charge but for a position information of ~100-150 microns.
- It would be good to find out when Ken wants us to be at CHESS; the last times he spent a day or so to set up the beamline - it would be good to know whether he is doing that on Friday or the weekend? Talk to you later this week.