Difference between revisions of "BLTWG Meeting 04/29/2013"

From GlueXWiki
Jump to: navigation, search
(Created page with "===Organization=== * Time: 11:30 EST * Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community) * Connecting: instructions are [[Tagged Beam Group Biweekly Meeting...")
 
(Agenda)
Line 8: Line 8:
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
# [https://halldweb1.jlab.org/manuals/HallD_Hodoscope.pdf Base/Amplifier for fixed-array PMT] - ''Vladimir''
 
 
# Report from accelerator liaison - ''Todd''
 
# Report from accelerator liaison - ''Todd''
 
# Report on the fixed array construction - ''Franz''
 
# Report on the fixed array construction - ''Franz''
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout]
 
#* [[fixed array: design]]
 
#* [[Bill's design]]
 
 
# Report on the microscope construction - ''James''
 
# Report on the microscope construction - ''James''
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule]
 
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/Ferrule-Size.pptx Progress on fiber fusing]
 
 
# Status of the microscope electronics construction - ''Alex''
 
# Status of the microscope electronics construction - ''Alex''
 
# Update on polarimetry - ''Mike''
 
# Update on polarimetry - ''Mike''

Revision as of 10:06, 29 April 2013

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Report from accelerator liaison - Todd
  3. Report on the fixed array construction - Franz
  4. Report on the microscope construction - James
  5. Status of the microscope electronics construction - Alex
  6. Update on polarimetry - Mike
  7. Discussion of installation issues - James
  8. Draft of tagger magnet mapping plan - Dan
  9. any other business