(Created page with "===Organization=== * Time: 11:30 EST * Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community) * Connecting: instructions are [[Tagged Beam Group Biweekly Meeting...")
 
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(14 intermediate revisions by 4 users not shown)
Line 3: Line 3:
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J., Alex B., James M., Brendan P, Curtis M, Alex S., Igor S., Jared, Bill C., Franz K., Mike D., and Dan S.
 
----
 
----
  
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
# [https://halldweb1.jlab.org/manuals/HallD_Hodoscope.pdf Base/Amplifier for fixed-array PMT] - ''Vladimir''
 
 
# Report from accelerator liaison - ''Todd''
 
# Report from accelerator liaison - ''Todd''
 
# Report on the fixed array construction - ''Franz''
 
# Report on the fixed array construction - ''Franz''
#* [http://faculty.cua.edu/sober/HallD/Counter_table_and_plots_22April13.html latest fixed array layout]
+
#* [[File:New-Opt3-lay.out| Counter locations (Dan) ]]
#* [[fixed array: design]]
+
#* [[fixed array: design| design update (Franz)]]
#* [[Bill's design]]
+
#* [[Technical drawings from Bill ]]
# Report on the microscope construction - ''James''
+
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2181 Status of the microscope construction] - ''James''
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/TAGM-Construction-Update-15Apr2013.docx Updated progress and schedule]
+
# Status of the microscope electronics - ''Alex''
#* [http://zeus.phys.uconn.edu/halld/glueXmeetings/mtg-4-15-2013/Ferrule-Size.pptx Progress on fiber fusing]
+
# New requirements related to pion polarizability - ''Richard''
# Status of the microscope electronics construction - ''Alex''
+
 
# Update on polarimetry - ''Mike''
 
# Update on polarimetry - ''Mike''
# Discussion of installation issues - ''James''
 
 
# Draft of tagger magnet mapping plan - ''Dan''
 
# Draft of tagger magnet mapping plan - ''Dan''
 +
# Update on the PS construction - ''Alex''
 
# ''any other business''
 
# ''any other business''

Latest revision as of 16:55, 24 February 2017

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., Alex B., James M., Brendan P, Curtis M, Alex S., Igor S., Jared, Bill C., Franz K., Mike D., and Dan S.

Agenda

  1. Announcements
  2. Report from accelerator liaison - Todd
  3. Report on the fixed array construction - Franz
  4. Status of the microscope construction - James
  5. Status of the microscope electronics - Alex
  6. New requirements related to pion polarizability - Richard
  7. Update on polarimetry - Mike
  8. Draft of tagger magnet mapping plan - Dan
  9. Update on the PS construction - Alex
  10. any other business