Difference between revisions of "BLTWG Meeting 04/29/2013"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private")
 
(4 intermediate revisions by 3 users not shown)
Line 3: Line 3:
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Place: ESNET and [http://research.seevogh.com Seevogh] (Jlab community)
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Richard J., Alex B., James M., Brendan P, Curtis M, Alex S., Igor S., Jared, Bill C., Franz K., Mike D., and Dan S.
 
----
 
----
  
Line 10: Line 10:
 
# Report from accelerator liaison - ''Todd''
 
# Report from accelerator liaison - ''Todd''
 
# Report on the fixed array construction - ''Franz''
 
# Report on the fixed array construction - ''Franz''
#* [[File:new-Opt3-lay.out | Counter locations (Dan) ]]
+
#* [[File:New-Opt3-lay.out| Counter locations (Dan) ]]
 +
#* [[fixed array: design| design update (Franz)]]
 
#* [[Technical drawings from Bill ]]
 
#* [[Technical drawings from Bill ]]
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2181 Status of the microscope construction] - ''James''
+
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2181 Status of the microscope construction] - ''James''
 
# Status of the microscope electronics - ''Alex''
 
# Status of the microscope electronics - ''Alex''
 
# New requirements related to pion polarizability - ''Richard''
 
# New requirements related to pion polarizability - ''Richard''

Latest revision as of 16:55, 24 February 2017

Organization

  • Time: 11:30 EST
  • Place: ESNET and Seevogh (Jlab community)
  • Connecting: instructions are here
  • Present: Richard J., Alex B., James M., Brendan P, Curtis M, Alex S., Igor S., Jared, Bill C., Franz K., Mike D., and Dan S.

Agenda

  1. Announcements
  2. Report from accelerator liaison - Todd
  3. Report on the fixed array construction - Franz
  4. Status of the microscope construction - James
  5. Status of the microscope electronics - Alex
  6. New requirements related to pion polarizability - Richard
  7. Update on polarimetry - Mike
  8. Draft of tagger magnet mapping plan - Dan
  9. Update on the PS construction - Alex
  10. any other business