Difference between revisions of "BLTWG Meeting 06/25/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 14: Line 14:
 
# Update on diamond radiator fabrication -- ''Brendan''
 
# Update on diamond radiator fabrication -- ''Brendan''
 
# Update on microscope construction -- ''James''
 
# Update on microscope construction -- ''James''
 +
#* possible loan of DAq system with FADC to UConn
 +
#* possible swap of two SIPM's with Jlab (soon?)
  
 
===Notes===
 
===Notes===

Revision as of 11:04, 25 June 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 549 9207)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Report from Glasgow group -- Ken
  3. Report from CUA group -- Franz, Alex
  4. Report from ASU group -- Mike
  5. Progress on UConn construction contract -- Alex
    • June 8 -- Issue solicitation
    • June 23 -- Receive proposals
  6. Update on diamond radiator fabrication -- Brendan
  7. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon?)

Notes