* Latest news from SINMAT:
+
* Latest news from SINMAT, as of June 20:
 
<blockquote>
 
<blockquote>
 
We have solved the problems etching now. We are trying to thing down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week time.
 
We have solved the problems etching now. We are trying to thing down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week time.
 
</blockquote>
 
</blockquote>

Revision as of 11:07, 25 June 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 549 9207)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Report from Glasgow group -- Ken
  3. Report from CUA group -- Franz, Alex
  4. Report from ASU group -- Mike
  5. Progress on UConn construction contract -- Alex
    • June 8 -- Issue solicitation
    • June 23 -- Receive proposals
  6. Update on diamond radiator fabrication -- Brendan
  7. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon?)

Notes

  • Latest news from SINMAT, as of June 20:

We have solved the problems etching now. We are trying to thing down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week time.