Difference between revisions of "BLTWG Meeting 06/25/2012"

From GlueXWiki
Jump to: navigation, search
m (Notes)
Line 23: Line 23:
 
* Latest news from SINMAT, as of June 20:
 
* Latest news from SINMAT, as of June 20:
 
<blockquote>
 
<blockquote>
We have solved the problems etching now. We are trying to thing down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week time.
+
We have solved the problems etching now. We are trying to thin down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week's time.
 
</blockquote>
 
</blockquote>

Revision as of 11:40, 25 June 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 549 9207)
  • Connecting: instructions are here
  • Present: Michael D., Barry R., Dan S., Tim W., Alex S., Liping G., Yi Q., Curtis M., Richard J., Brendan P, Alex B., Fridah M., and Igor S.

Agenda

  1. Announcements
  2. Report from Glasgow group -- Ken
  3. Report from CUA group -- Franz, Alex
  4. Report from ASU group -- Mike
  5. Report from UNCW group -- Liping
  6. Discussion with accelerator group on beam parameters -- Alex
  7. Progress on UConn construction contract -- Alex
    • June 8 -- Issue solicitation
    • June 23 -- Receive proposals
  8. Update on diamond radiator fabrication -- Brendan
  9. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon?)

Notes

  • Latest news from SINMAT, as of June 20:

We have solved the problems etching now. We are trying to thin down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week's time.