Difference between revisions of "BLTWG Meeting 07/09/2012"

From GlueXWiki
Jump to: navigation, search
(Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id 555 2690) * Connecting: instructions are here * Present: ---- ===Agen...")
 
(Agenda)
Line 9: Line 9:
 
#* June 3 -- Solicitation received at UConn !
 
#* June 3 -- Solicitation received at UConn !
 
#* June 20 -- Response from UConn to solicitation
 
#* June 20 -- Response from UConn to solicitation
# Requirements for low current operation -- ''Liping''
+
# [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping''
 
# Study of the fixed tagger array geometry -- ''Dan''
 
# Study of the fixed tagger array geometry -- ''Dan''
 
# Report from Glasgow group -- ''Ken''
 
# Report from Glasgow group -- ''Ken''

Revision as of 10:56, 9 July 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 555 2690)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Progress on UConn construction contract -- Richard
    • June 3 -- Solicitation received at UConn !
    • June 20 -- Response from UConn to solicitation
  3. Requirements for low current operation -- Liping
  4. Study of the fixed tagger array geometry -- Dan
  5. Report from Glasgow group -- Ken
  6. Report from ASU group -- Mike
  7. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon??)