Difference between revisions of "BLTWG Meeting 07/09/2012"
From GlueXWiki
(→Agenda) |
|||
Line 2: | Line 2: | ||
* Place: ESNET and EVO (with telephone bridge id 555 2690) | * Place: ESNET and EVO (with telephone bridge id 555 2690) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Mike D., Barry R., Dan S., Franz K., Alex S., Tim W., Yi Q., Curtis M., Richard J., Igor S., Brendan P., Fridah M., James M., and Alex B. |
---- | ---- | ||
===Agenda=== | ===Agenda=== |
Revision as of 11:35, 9 July 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 555 2690)
- Connecting: instructions are here
- Present: Mike D., Barry R., Dan S., Franz K., Alex S., Tim W., Yi Q., Curtis M., Richard J., Igor S., Brendan P., Fridah M., James M., and Alex B.
Agenda
- Announcements
- Progress on UConn construction contract -- Richard
- June 3 -- Solicitation received at UConn !
- June 20 -- Response from UConn to solicitation
- Requirements for low current operation -- Liping
- Study of the fixed tagger array geometry -- Dan File:End30MeVsteps.pdf; File:Hodo4cm1.pdf; File:E6w25.pdf
- top view of microscope box -- James
- Report from Glasgow group -- Ken
- Report from ASU group -- Mike
- Update on microscope construction -- James
- possible loan of DAq system with FADC to UConn
- possible swap of two SIPM's with Jlab (soon??)