Difference between revisions of "BLTWG Meeting 07/09/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 10: Line 10:
 
#* June 20 -- Response from UConn to solicitation
 
#* June 20 -- Response from UConn to solicitation
 
# [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping''
 
# [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping''
# Study of the fixed tagger array geometry -- ''Dan'' [[File:end30MeVsteps.pdf]]; [[File:hodo4cm1.pdf]]; [[File:e6w25.pdf]]
+
# Study of the fixed tagger array geometry -- ''Dan''
 +
#* [[File:end30MeVsteps.pdf]]
 +
#* [[File:hodo4cm1.pdf]]
 +
#* [[File:e6w25.pdf]]
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/topview-7-2012.pdf top view of microscope box] -- ''James''
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/topview-7-2012.pdf top view of microscope box] -- ''James''
 
# Report from Glasgow group -- ''Ken''
 
# Report from Glasgow group -- ''Ken''

Revision as of 11:37, 9 July 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 555 2690)
  • Connecting: instructions are here
  • Present: Mike D., Barry R., Dan S., Franz K., Alex S., Tim W., Yi Q., Curtis M., Richard J., Igor S., Brendan P., Fridah M., James M., and Alex B.

Agenda

  1. Announcements
  2. Progress on UConn construction contract -- Richard
    • June 3 -- Solicitation received at UConn !
    • June 20 -- Response from UConn to solicitation
  3. Requirements for low current operation -- Liping
  4. Study of the fixed tagger array geometry -- Dan
  5. Report from Glasgow group -- Ken
  6. Report from ASU group -- Mike
  7. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon??)