# Announcements
 
# Announcements
 
# Progress on UConn construction contract -- ''Richard''
 
# Progress on UConn construction contract -- ''Richard''
#* June 3 -- Solicitation received at UConn !
+
#* July 3 -- Solicitation received at UConn !
#* June 20 -- Response from UConn to solicitation
+
#* July 10 -- Response from UConn to solicitation
 
# [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping''
 
# [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping''
 
# Study of the fixed tagger array geometry -- ''Dan''
 
# Study of the fixed tagger array geometry -- ''Dan''

Revision as of 11:38, 9 July 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 555 2690)
  • Connecting: instructions are here
  • Present: Mike D., Barry R., Dan S., Franz K., Alex S., Tim W., Yi Q., Curtis M., Richard J., Igor S., Brendan P., Fridah M., James M., and Alex B.

Agenda

  1. Announcements
  2. Progress on UConn construction contract -- Richard
    • July 3 -- Solicitation received at UConn !
    • July 10 -- Response from UConn to solicitation
  3. Requirements for low current operation -- Liping
  4. Study of the fixed tagger array geometry -- Dan
  5. Report from Glasgow group -- Ken
  6. Report from ASU group -- Mike
  7. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon??)