(Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id 555 2690) * Connecting: instructions are here * Present: ---- ===Agen...")
 
(Agenda)
 
(9 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 555 2690)  
 
* Place: ESNET and EVO (with telephone bridge id 555 2690)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present:  
+
* Present: Mike D., Barry R., Dan S., Franz K., Alex S., Tim W., Yi Q., Curtis M., Richard J., Igor S., Brendan P., Fridah M., James M., Eugene C., and Alex B.
 
----
 
----
 
===Agenda===
 
===Agenda===
 
# Announcements
 
# Announcements
 
# Progress on UConn construction contract -- ''Richard''
 
# Progress on UConn construction contract -- ''Richard''
#* June 3 -- Solicitation received at UConn !
+
#* July 3 -- Solicitation received at UConn !
#* June 20 -- Response from UConn to solicitation
+
#* July 20 -- Response from UConn to solicitation
# Requirements for low current operation -- ''Liping''
+
# Progress on CUA construction contract -- ''Franz''
 +
# [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping''
 
# Study of the fixed tagger array geometry -- ''Dan''
 
# Study of the fixed tagger array geometry -- ''Dan''
 +
#* [[File:end30MeVsteps.pdf]]
 +
#* [[File:hodo4cm1.pdf]]
 +
#* [[File:e6w25.pdf]]
 +
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/topview-7-2012.pdf top view of microscope box] -- ''James''
 
# Report from Glasgow group -- ''Ken''
 
# Report from Glasgow group -- ''Ken''
 
# Report from ASU group -- ''Mike''
 
# Report from ASU group -- ''Mike''
Line 16: Line 21:
 
#* possible loan of DAq system with FADC to UConn
 
#* possible loan of DAq system with FADC to UConn
 
#* possible swap of two SIPM's with Jlab (soon??)
 
#* possible swap of two SIPM's with Jlab (soon??)
 +
# Plan for mapping the tagger magnet -- ''future discussion''

Latest revision as of 12:02, 11 July 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 555 2690)
  • Connecting: instructions are here
  • Present: Mike D., Barry R., Dan S., Franz K., Alex S., Tim W., Yi Q., Curtis M., Richard J., Igor S., Brendan P., Fridah M., James M., Eugene C., and Alex B.

Agenda

  1. Announcements
  2. Progress on UConn construction contract -- Richard
    • July 3 -- Solicitation received at UConn !
    • July 20 -- Response from UConn to solicitation
  3. Progress on CUA construction contract -- Franz
  4. Requirements for low current operation -- Liping
  5. Study of the fixed tagger array geometry -- Dan
  6. Report from Glasgow group -- Ken
  7. Report from ASU group -- Mike
  8. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon??)
  9. Plan for mapping the tagger magnet -- future discussion