Difference between revisions of "BLTWG Meeting 07/09/2012"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 10: | Line 10: | ||
#* June 20 -- Response from UConn to solicitation | #* June 20 -- Response from UConn to solicitation | ||
# [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping'' | # [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping'' | ||
− | # Study of the fixed tagger array geometry -- ''Dan'' | + | # Study of the fixed tagger array geometry -- ''Dan'' [[File:end30MeVsteps.pdf]]; [[File:hodo4cm1.pdf]]; [[File:e6w25.pdf]] |
# Report from Glasgow group -- ''Ken'' | # Report from Glasgow group -- ''Ken'' | ||
# Report from ASU group -- ''Mike'' | # Report from ASU group -- ''Mike'' |
Revision as of 11:13, 9 July 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 555 2690)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- Progress on UConn construction contract -- Richard
- June 3 -- Solicitation received at UConn !
- June 20 -- Response from UConn to solicitation
- Requirements for low current operation -- Liping
- Study of the fixed tagger array geometry -- Dan File:End30MeVsteps.pdf; File:Hodo4cm1.pdf; File:E6w25.pdf
- Report from Glasgow group -- Ken
- Report from ASU group -- Mike
- Update on microscope construction -- James
- possible loan of DAq system with FADC to UConn
- possible swap of two SIPM's with Jlab (soon??)