Difference between revisions of "BLTWG Meeting 07/09/2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 10: Line 10:
 
#* June 20 -- Response from UConn to solicitation
 
#* June 20 -- Response from UConn to solicitation
 
# [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping''
 
# [http://zeus.phys.uconn.edu/halld/tagger/lowcurrent-7-2012/Photon-Flux-Gan.pptx Requirements for low current operation] -- ''Liping''
# Study of the fixed tagger array geometry -- ''Dan''
+
# Study of the fixed tagger array geometry -- ''Dan'' [[File:end30MeVsteps.pdf]]; [[File:hodo4cm1.pdf]]; [[File:e6w25.pdf]]
 
# Report from Glasgow group -- ''Ken''
 
# Report from Glasgow group -- ''Ken''
 
# Report from ASU group -- ''Mike''
 
# Report from ASU group -- ''Mike''

Revision as of 11:13, 9 July 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 555 2690)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Progress on UConn construction contract -- Richard
    • June 3 -- Solicitation received at UConn !
    • June 20 -- Response from UConn to solicitation
  3. Requirements for low current operation -- Liping
  4. Study of the fixed tagger array geometry -- Dan File:End30MeVsteps.pdfFile:Hodo4cm1.pdfFile:E6w25.pdf
  5. Report from Glasgow group -- Ken
  6. Report from ASU group -- Mike
  7. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon??)