Difference between revisions of "BLTWG Meeting 07/23/2012"
From GlueXWiki
(Created page with "* Time: 11:30 EST * Place: ESNET and EVO (with telephone bridge id 555 2690) * Connecting: instructions are here * Present: ---- ===Agen...") |
|||
Line 1: | Line 1: | ||
* Time: 11:30 EST | * Time: 11:30 EST | ||
− | * Place: ESNET and EVO (with telephone bridge id | + | * Place: ESNET and EVO (with telephone bridge id 561 3418) |
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
* Present: | * Present: |
Revision as of 10:44, 23 July 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 561 3418)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- Progress on UConn construction contract -- Richard
- Requirements for low current operation -- discussion
- The fixed tagger array geometry -- Dan
- Report from Glasgow group -- Ken
- Report from ASU group -- Mike
- Update on microscope construction -- James
- possible loan of DAq system with FADC to UConn
- possible swap of two SIPM's with Jlab (soon??)
- Plan for mapping the tagger magnet -- future discussion
Notes
- top view of microscope box -- James