Revision as of 10:47, 23 July 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 561 3418)
  • Connecting: instructions are here
  • Present:

Agenda

  1. Announcements
  2. Progress on UConn construction contract -- Richard
  3. Requirements for low current operation -- discussion
  4. The fixed tagger array geometry -- Dan
  5. Report from Glasgow group -- Ken
  6. Report from ASU group -- Mike
  7. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon??)
  8. Plan for mapping the tagger magnet -- future discussion

Notes