Difference between revisions of "BLTWG Meeting 07/23/2012"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 10: | Line 10: | ||
# The fixed tagger array geometry -- ''Dan'' | # The fixed tagger array geometry -- ''Dan'' | ||
# Report from Glasgow group -- ''Ken'' | # Report from Glasgow group -- ''Ken'' | ||
+ | #* [[private:goniometer quote from Newport]] | ||
# Report from ASU group -- ''Mike'' | # Report from ASU group -- ''Mike'' | ||
# Update on diamond thinning from SINMAT -- ''Richard'' | # Update on diamond thinning from SINMAT -- ''Richard'' |
Revision as of 11:09, 23 July 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 561 3418)
- Connecting: instructions are here
- Present:
Agenda
- Announcements
- Progress on UConn construction contract -- Richard
- Requirements for low current operation -- discussion
- The fixed tagger array geometry -- Dan
- Report from Glasgow group -- Ken
- Report from ASU group -- Mike
- Update on diamond thinning from SINMAT -- Richard
- Update on microscope construction -- James
- possible loan of DAq system with FADC to UConn
- possible swap of two SIPM's with Jlab (soon??)
- Plan for mapping the tagger magnet -- future discussion