Difference between revisions of "BLTWG Meeting 07/23/2012"

From GlueXWiki
Jump to: navigation, search
m
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 561 3418)  
 
* Place: ESNET and EVO (with telephone bridge id 561 3418)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Alex S., Yi Q., Tim W., Curtis M., Richard J., Igor S., Alex B., Fridah M., and James M.
+
* Present: Alex S., Yi Q., Tim W., Curtis M., Richard J., Igor S., Alex B., Fridah M., Mike D., Dan S., and James M.
 
----
 
----
 
===Agenda===
 
===Agenda===

Revision as of 11:54, 23 July 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 561 3418)
  • Connecting: instructions are here
  • Present: Alex S., Yi Q., Tim W., Curtis M., Richard J., Igor S., Alex B., Fridah M., Mike D., Dan S., and James M.

Agenda

  1. Announcements
  2. Progress on UConn construction contract -- Richard
  3. Requirements for low current operation -- discussion
  4. Visual monitoring of the radiator -- Yi
  5. Beginnings of a plan for mapping the tagger magnet -- Dan
  6. The fixed tagger array geometry -- Dan
  7. Report from Glasgow group -- Ken
  8. Report from ASU group -- Mike Rough draft of polarimeter vacuum box
  9. Update on diamond thinning from SINMAT -- Richard
  10. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon??)

Notes