Difference between revisions of "BLTWG Meeting 07/23/2012"

From GlueXWiki
Jump to: navigation, search
m (Text replacement - "http://argus.phys.uregina.ca/gluex" to "https://halldweb.jlab.org")
 
(3 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
* Place: ESNET and EVO (with telephone bridge id 561 3418)  
 
* Place: ESNET and EVO (with telephone bridge id 561 3418)  
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
 
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]]
* Present: Alex S., Yi Q., Tim W., Curtis M., Richard J., Igor S., Alex B., Fridah M., and James M.
+
* Present: Alex S., Yi Q., Tim W., Curtis M., Richard J., Igor S., Alex B., Fridah M., Mike D., Dan S., and James M.
 
----
 
----
 
===Agenda===
 
===Agenda===
Line 9: Line 9:
 
# Requirements for low current operation -- ''discussion''
 
# Requirements for low current operation -- ''discussion''
 
# Visual monitoring of the radiator -- ''Yi''
 
# Visual monitoring of the radiator -- ''Yi''
# [http://argus.phys.uregina.ca/gluex/DocDB/0020/002034/001/HallD_mapping.ppt Beginnings of a plan for mapping the tagger magnet] -- ''Dan''
+
#* [http://www.fluke.com/fluke/usen/Thermal-Imaging/ti-best-performance/Fluke-Ti32.htm?PID=56184 Fluke Ti32]
 +
#* [http://www.flir.com/cs/emea/en/view/?id=41959 FLIR E-Series]
 +
# [https://halldweb.jlab.org/DocDB/0020/002034/001/HallD_mapping.ppt Beginnings of a plan for mapping the tagger magnet] -- ''Dan''
 
# The fixed tagger array geometry -- ''Dan''
 
# The fixed tagger array geometry -- ''Dan''
 
# Report from Glasgow group -- ''Ken''
 
# Report from Glasgow group -- ''Ken''
Line 18: Line 20:
 
#* possible loan of DAq system with FADC to UConn
 
#* possible loan of DAq system with FADC to UConn
 
#* possible swap of two SIPM's with Jlab (soon??)
 
#* possible swap of two SIPM's with Jlab (soon??)
 
 
  
 
===Notes===
 
===Notes===
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/microscopeLayout-7-2012.pdf different views of the microscope box, current design] -- ''James''
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/microscopeLayout-7-2012.pdf different views of the microscope box, current design] -- ''James''

Latest revision as of 12:39, 14 March 2017

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 561 3418)
  • Connecting: instructions are here
  • Present: Alex S., Yi Q., Tim W., Curtis M., Richard J., Igor S., Alex B., Fridah M., Mike D., Dan S., and James M.

Agenda

  1. Announcements
  2. Progress on UConn construction contract -- Richard
  3. Requirements for low current operation -- discussion
  4. Visual monitoring of the radiator -- Yi
  5. Beginnings of a plan for mapping the tagger magnet -- Dan
  6. The fixed tagger array geometry -- Dan
  7. Report from Glasgow group -- Ken
  8. Report from ASU group -- Mike Rough draft of polarimeter vacuum box
  9. Update on diamond thinning from SINMAT -- Richard
  10. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon??)

Notes