Difference between revisions of "BLTWG Meeting 07/23/2012"

From GlueXWiki
Jump to: navigation, search
m (Agenda)
Line 9: Line 9:
 
# Requirements for low current operation -- ''discussion''
 
# Requirements for low current operation -- ''discussion''
 
# Visual monitoring of the radiator -- ''Yi''
 
# Visual monitoring of the radiator -- ''Yi''
 +
#* [http://www.fluke.com/fluke/usen/Thermal-Imaging/ti-best-performance/Fluke-Ti32.htm?PID=56184 Fluke Ti32]
 +
#* [http://www.flir.com/thermography/americas/us/view/?id=56911&collectionid=664&col=50850 FLIR E-Series]
 
# [http://argus.phys.uregina.ca/gluex/DocDB/0020/002034/001/HallD_mapping.ppt Beginnings of a plan for mapping the tagger magnet] -- ''Dan''
 
# [http://argus.phys.uregina.ca/gluex/DocDB/0020/002034/001/HallD_mapping.ppt Beginnings of a plan for mapping the tagger magnet] -- ''Dan''
 
# The fixed tagger array geometry -- ''Dan''
 
# The fixed tagger array geometry -- ''Dan''
Line 18: Line 20:
 
#* possible loan of DAq system with FADC to UConn
 
#* possible loan of DAq system with FADC to UConn
 
#* possible swap of two SIPM's with Jlab (soon??)
 
#* possible swap of two SIPM's with Jlab (soon??)
 
 
  
 
===Notes===
 
===Notes===
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/microscopeLayout-7-2012.pdf different views of the microscope box, current design] -- ''James''
 
#* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/microscopeLayout-7-2012.pdf different views of the microscope box, current design] -- ''James''

Revision as of 11:49, 23 July 2012

  • Time: 11:30 EST
  • Place: ESNET and EVO (with telephone bridge id 561 3418)
  • Connecting: instructions are here
  • Present: Alex S., Yi Q., Tim W., Curtis M., Richard J., Igor S., Alex B., Fridah M., and James M.

Agenda

  1. Announcements
  2. Progress on UConn construction contract -- Richard
  3. Requirements for low current operation -- discussion
  4. Visual monitoring of the radiator -- Yi
  5. Beginnings of a plan for mapping the tagger magnet -- Dan
  6. The fixed tagger array geometry -- Dan
  7. Report from Glasgow group -- Ken
  8. Report from ASU group -- Mike Rough draft of polarimeter vacuum box
  9. Update on diamond thinning from SINMAT -- Richard
  10. Update on microscope construction -- James
    • possible loan of DAq system with FADC to UConn
    • possible swap of two SIPM's with Jlab (soon??)

Notes